Enviromental Housing, Böblingen
![](files/theme.aep2016/img/projekte/Wohnen%20u.%20Arbeiten/Wohnanlage%20Boeblingen/aep-boeblingen-03.jpg)
![](files/theme.aep2016/img/projekte/Wohnen%20u.%20Arbeiten/Wohnanlage%20Boeblingen/aep-boeblingen-01.jpg)
![](files/theme.aep2016/img/projekte/Wohnen%20u.%20Arbeiten/Wohnanlage%20Boeblingen/aep-boeblingen-02.jpg)
The design is based on the idea to extend the green park, by using the theme of water - meadows - garden and translating them to the residential housing blocks. The "living matrix" becomes denser towards the street and creates a 3-4 floor storey building frontage.
One building (20mx35m) exists of seven allotments. Each allotment (100m²) can be designed from a catalogue offering different floorplan layouts. A high degree of flexibility for extensions and customised design is given.
Project Data | |
Period Overall Cost Net Area Gross Area Work Stages HOAI Competition |
1997 1-2 3rd Prize |